Access control installation · Houston

Start a Houston Door Access Project With a Door List

Call (832) 346-4734 Send the form

  • ClearMax technicians on site
  • Written notes on every change
  • Written quote from your details
access control installation for businesses in Houston

Send the list of doors you want on access control and the date your Houston space has to open, and the reply comes back as questions, then a scope in writing. Rough is fine. Most first notes run a few lines and carry phone photos of the doors.

Last updated: November 2026

Send the door list here

Business contact information only. Do not include door codes, badge numbers or alarm codes.

Calls to this number may be recorded or answered by an automated assistant. Please do not share door codes, badge numbers or alarm codes by phone.

What makes the first reply fast

  1. The building. A downtown high-rise floor, a Westchase office park, a tilt-wall warehouse off the Beltway and a strip-center storefront each change the cable route and who must approve the drilling.
  2. Each door on its own line, with its job: main entry, back exit, network closet, stockroom, dock door, gate.
  3. What is on each door today: plain keys, push-button combos, a reader the building put in, a legacy card setup, a doorbell, or nothing at all.
  4. Two photos of every door, one from each face, with the jamb and handle in frame. Glass, storefront metal, steel and timber doors each take a different lock.
  5. Head count, and whether some people move between floors or sites.
  6. The building contact if you lease: property manager or chief engineer, since most Houston landlords want the hardware schedule and proof of insurance before work begins.
  7. The open date, plus the state of the space today: bare shell, under construction or already in use.

Mention extras you are weighing, like intercom installation or a camera over an entry, and they get routed on the same cable plan.

The photo set that answers most questions

Per door: face-on from the corridor, face-on from the room, a tight picture of the jamb at the strike plate, and the hinge edge. Then the open closet and the ceiling tiles above the entrance. Those few images usually settle what the door is made of, how the frame was built, whether cable can run overhead and where a panel can hang.

Which doors are yours to lock?

In a lease, some openings are yours and some belong to the owner. Your entry, interior rooms and closet are normally yours. Stairwell doors, shared corridor doors and elevator-lobby doors usually are not, even if your staff use them daily. Tag every door as mine, landlord's or not sure; the not-sure ones get settled with management before anything is drawn up.

Two requests that need the building first

Some doors depend on how the whole building is protected, so say so in your note. One is a stockroom door meant to pause briefly after someone pushes it. A delayed egress lock needs a building equipped throughout with an automatic sprinkler system or an approved automatic smoke or heat detection system. The other is locking the doors off an elevator lobby on a tenant floor. Houston adds a section of its own for exit doors leaving elevator lobbies: they may be locked electrically from the egress side in buildings with sprinklers throughout or approved smoke or heat detection. Both go to your architect or the building engineer as questions, and the rest of the job moves ahead.

Already open for business?

Say when drilling has to stop and which entrances can never be out of use. Doors are then changed singly, each exit still lets people out mid-swap, and loud work is held for the hours your landlord allows.

Moving, or adding a site

Send both addresses. Wiring and testing at the new space happen while the old one stays in use, and cutover is a single evening or weekend. Opening another location? Note the staff numbers at each, because a single roster across sites is set up unlike two separate ones.

Leave the codes at home

Keep combinations, card numbers, panel PINs and existing system passwords out of the message. Doors and pictures cover everything needed. Fresh credentials are given out face to face on handover day.

This form is for planning

Notes are picked up on weekdays and are for new projects or changes to a system. Planning a project? The form above and the number at the top of the page both reach the planning desk. Anyone already on a service plan uses the number printed in their handover papers.

After you hit submit

Someone reads the note and follows up on gaps. A written scope follows, door by door: credential type, locking hardware, the inside release and the schedule. Houston has built to the 2021 Houston Construction Code since January 1, 2024. The scope is drawn to that edition with the city's amendments. Should the site hide something, like a concrete-filled frame or a riser with no space left, the scope gets rewritten together before anything continues. It spells out your part on install days too: open ceilings, closet space, a way into the building, one named contact. On the last day each door is proven in front of you, admin rights pass to your chosen person, and every record is yours.

Call (832) 346-4734